First casting of the nuke plant. The final product will be lightly weather dusted and have all the red marker lights at the top of the tower and grounding rods. There will be a complete sound system with warning alarm to evacuate. The main operations center contains the top half of a motorized rotary beacon that will spin with red danger/warning lights. There will be spotlights in the front of the building(not shown) there are 4 smoke units in the cooling tower with a fan. The smoke exits the cooling tower similar to the real deal. This is NOT a large footprint accessory. The tower is not full scale as it would be overwhelming but is 2 feet tall and very tastefully done. Enjoy the photos. I will have the pre production sample photo in the April lion roars
Lou Caponi
Thanks go out to Harry Hieke.