Skip to main content

So, first off, I am in probably in the wrong category!! Secondly, I have not operated my layout in about 5 yrs, what a shame I know!! Here is what I have, 2 Lionel Lift Bridges from the 90's that are sitting on two abutments linking the two halves of my layout. Ducking under is not an option anymore, plus I don't want to operate the lift bridges as they were designed. I want to lift them both together as one to avoid the duck under, but also a system that looks decent as this is a finished train room. I have attached some pics to see what I have going on. I know someone out there has the answer as you guys/gals always do!! I would like to finally get this figured out to I can start running the layout again!!

Thanks, Jeff

Attachments

Images (3)
  • P5200594
  • P5200595
  • P5200600
Original Post

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×