So, first off, I am in probably in the wrong category!! Secondly, I have not operated my layout in about 5 yrs, what a shame I know!! Here is what I have, 2 Lionel Lift Bridges from the 90's that are sitting on two abutments linking the two halves of my layout. Ducking under is not an option anymore, plus I don't want to operate the lift bridges as they were designed. I want to lift them both together as one to avoid the duck under, but also a system that looks decent as this is a finished train room. I have attached some pics to see what I have going on. I know someone out there has the answer as you guys/gals always do!! I would like to finally get this figured out to I can start running the layout again!!
Thanks, Jeff