quote:
Someone asked this in another thread...no answer yet, but how is 1.3 with the SC-2 route switching. I have to set the timing to about 2 seconds to avoid getting missed switches. Would there be any inprovement for this issue?
quote:
Individual switch commands ALWAYS work but I can't get 100% route switching success every time, no matter what delay I put in the routes. The best appoach is to put in redundant commands and use 1 second (or less) so you still have time to issue the route command a couple of more times, if necessary, before the train gets to the switch location. The real annoyance is that the switching problem happens on CAB-2 playback also, and is not just limited to routes. Sometimes individual switch commands do not get through on the playback. You can't leave the CAB-2 playback unattended.
quote:
Wish we could do something to fix this, however it is not in Legacy operating system. The SC2 cannot take the commands any quicker.
quote:
I want to add to my layout but haven't bought any new switches in over a year, waiting for the new Command Fastrack switches that don't need an SC-2. Shipping schedule says Sept. I hope these will fix the problem.