Hi OGR Land.
I do not have a track planning program so here is a scan of my hand drawn layout plan. This is a "keep it simple" type of idea. I have 16' by 27' to work with. I want 0-72 min mainline curves (which I have a bunch of) and at this point, 0-54 in the yard and industry (which I have a bunch of). The idea is to operate Hot Metal moves and Slag Pots between the two industry's as a Point to Point. Yet be able to run a train around the loop if wanted. The yard will hold trains for the dispatcher to call on and thus provide run through "trafic" for the mill trains to deal with. Very simple and basic. Purposely staying away from the bowl of spaghetti track plan. Along with this idea is BIG scenery which I totaly blame on Patrick H. His layout has single handedly forced me to look into 3RS with big scenery! Which is not a bad thing.
The green is Lionel 0-72 while the yellow is Atlas O 0-54.
Rick.