I have a ton of projects I need to accomplish; from several engines due upgrades, to a couple of engines needing repair, to switches require wiring, block signals to install, ballasting the track, installing more kadee couplers, etc, etc. But, when ever I go down stairs to work on projects those darn trains(that are running) beckon me to power them up and run them. In doing so I get nothing done. Those darn trains keep getting in the way of progress.
Anyway Merry Christmas and run them if you got them.