Just need a quick yes/no on this one. I have verified continuity between my neutral and ground wires. The TMCC Command Base is attached with Velcro to a 12 gauge steel subpanel. The TMCC is connected to the common on the track. Do I also want to tie to the building ground?
Tks.
Gilly