Skip to main content

What ISN'T on the workbench at the moment? The one commanding most of my time right now is a replacement end for a K-line 4680-30012 18" business car. Instead of the fanciful open deck it comes with (was there ever a real prototype for this? Not on the PRR), I'm replacing it with the correct end for PRR's postwar observation cars. Printed a test run today, final one tomorrow. Hope to have it painted and installed sometime this weekend...

310554911_194070146339627_238206579022423706_n

Attachments

Images (1)
  • 310554911_194070146339627_238206579022423706_n

Got the ATSF Texas cosmetically completed (tender was done already). It was unpainted (like the tender) and missing some parts. I had to rummage around in my junk bin to fin the sand dome fill covers, engineer/fireman figures, and a couple of pipes under the boiler. While I was at it I also removed the factory stamped metal bell cradle and added the correct cradle with air ringer. I also added a bell bracket that had a pull arm (late ATSF large steam had an air ringer but the bell could still be rung manually by the fireman if the air ringer failed). I wanted to run cords for the whistle and bell so I drilled some holes in the boiler and added stanchions to use as cord guides. I know 5012 is a factory MTH road number but I used it because the illuminated number boards and number board under the headlight already had that number, so I decided to make my life easier and just use road number 5012. It still needs electronics and lights, but I'll get to those over the winter.

20221009_10582720221009_10590320221009_11030520221009_110406

Attachments

Images (4)
  • 20221009_105827
  • 20221009_105903
  • 20221009_110305
  • 20221009_110406

So, I took my tender from the 785 Hudson and upgraded the sound board. Sadly the original sound o steam board with it's tether I couldn't stand went out. Darn. So, I found passenger car 6 wheel trucks with a roller and ground strap. Mounted those, drilled a new hole so the coupler is closer. Mounted the rail sounds board, installed the reed switch, set the volume, and Bob's your uncle! Looks much better and cleaner without the tether! Sounds nice with chuffing, bell, and whistle. At idle it sounds like it's getting maintenance done. Picture of sound board below. I don't want to take the shell back off.  PXL_20221010_004551643PXL_20221010_004626866PXL_20221010_004556044PXL_20221010_004613248

Screenshot_20221009-210107

Attachments

Images (5)
  • PXL_20221010_004551643
  • PXL_20221010_004626866
  • PXL_20221010_004556044
  • PXL_20221010_004613248
  • Screenshot_20221009-210107
Videos (1)
PXL_20221010_005337955.TS
Last edited by Donnie Kennedy
@Rppoind posted:

Lou....Engine and tender look great. I have the paint and matt clear you reccommended on order for My SF 2926 project. Like your engine the firebox door on the rebuild of 2926 appears silver instead of graphite or black. Did you use the same brand of paint we discussed? Which silver did you use?

Richard

I used this spray paint for the smokebox front:

https://www.rustoleum.com/prod...metallic-spray-paint

It's a close enough match for "tarpon gray" that Santa Fe used on smokebox fronts, at least to my eye.

20221011_194414

Got the shell swaps done on both of my Weaver C628s. Now I am working on my Weaver E8s. Another "deal" I got from Trainz. Shells weren't mounted and were unmountable when I got them. Also had a bad truck on one of them. Working on getting the shells prepped for mounting and swapping bad truck out with a dummy until I can get the gear replaced on the bad truck. probably going to take several hours to get these usable.

Attachments

Images (1)
  • 20221011_194414
Last edited by Mike D

My new work bench. Just got it installed. No drawer fronts or cabinets doors yet as I am still finishing those and will install later. My new work bench is 22 feet long so I will be able pile a lot of stuff on it. The only thing on it at the moment is one of my bridges that I have laser cut.

Once I get it piled high with stuff I will post additional pictures so that it will look like a real work bench.

PXL_20221012_210514514PXL_20221012_210517587PXL_20221012_210527402

Thanks;

idea-thinker

Attachments

Images (3)
  • PXL_20221012_210514514
  • PXL_20221012_210517587
  • PXL_20221012_210527402

My new work bench. Just got it installed. No drawer fronts or cabinets doors yet as I am still finishing those and will install later. My new work bench is 22 feet long so I will be able pile a lot of stuff on it. The only thing on it at the moment is one of my bridges that I have laser cut.

Once I get it piled high with stuff I will post additional pictures so that it will look like a real work bench.

PXL_20221012_210514514

Thanks;

idea-thinker

What a great work space. Please share more pix once it has settled into it's "natural state"

Bob

The first of three coaches being redone for the Texas Zephyr. These cars will be “prototype-ish”. The first (1940) TZ equipment had BURLINGTON on the letterboards. When the semi-articulated 1936 Denver Zephyr equipment was bought by C&S and FW&D to makeover the TZ, those letterboards were repainted TEXAS ZEPHYR.  So, you can see from where the “-ish” comes.
This is a K-Line 21” Empire State Express coach.  New letterboards had to be applied. It had disappointing diaphragms, so they were replaced. The aluminum was too glossy so it was overcoated with a matte silver paint.  I printed custom decals for this project only a few days before K4 came out with their own beautiful TZ set.
520A804C-9C93-4CD6-9C61-01D7D6BC103779011652-DC52-46A7-B4EC-02E439DBCE94

Attachments

Images (2)
  • 520A804C-9C93-4CD6-9C61-01D7D6BC1037
  • 79011652-DC52-46A7-B4EC-02E439DBCE94

Got a Doodlebug pair in for a TMCC upgrade.  The dummy is featured here, I used my previously designed little R2LC dummy locomotive board to add couplers, headlight control, and command control of the interior lights.

Conveniently, all the lighting is done with spring pads, so the only shell work was changing out the headlight bulb from the 1.5V bulb used for PS/1.

MTH Doodlebug Dummy TMCC Upgrade N1

Here's the dummy locomotive motherboard plugged into the R2LC.

MTH Doodlebug Dummy TMCC Upgrade N2

Once the board was wired, I just used Velcro to stick the assembly to the bulkhead that's hidden when the shell is on, perfect spot for it.  You could, if you desired, simply add a second sound board to the dummy for better sounds, I didn't do that for this build.

MTH Doodlebug Dummy TMCC Upgrade N3MTH Doodlebug Dummy TMCC Upgrade N4

Attachments

Images (4)
  • MTH Doodlebug Dummy TMCC Upgrade N1
  • MTH Doodlebug Dummy TMCC Upgrade N2
  • MTH Doodlebug Dummy TMCC Upgrade N3
  • MTH Doodlebug Dummy TMCC Upgrade N4

20221017_210856

Next up is my MPC gantry crane. It's going to get new metal wheels to replace the factory plastic wheels, then I am going to clean up the gantry castings and repaint in a silver color that is a little more prototypical for U.P. equipment. Probably going to add a magnet assy as well. Just a dummy for the look of a magnet since it's home will be a scrap yard. I probably won't get a chance to paint until next week depending on the weather.

Attachments

Images (1)
  • 20221017_210856
Last edited by Mike D

Don't know if this might help someone with a similar issue.........

This MTH  Premier Gp38 ps3 sat on the shelf for a year and would only start running forward with no lights or sound on my test track.

Out of frustration with no improvement running it on the track , I turned it on its back and hooked up a couple of power clips and continued to run it  that way.

After quite awhile of running it this way, I must have started to wake up something inside .     I placed it back on the test track and had good results and now it performes flawlessly on the DCS / TIU / REMOTE  layout.

(Glad no bad board  )

Attachments

Videos (1)
20221018_132411

The old Carpet & Southern RR encountered a problem when some new double stack container cars arrived.  Seems the old Atlas bridges didn't quite have the clearance necessary so some modifications were in order. 

So the construction crew (me) carefully removed and modified the offending bridge parts.

mceclip0Cutting jig

After cutting a small piece of styrene was added to the cut, pieces were glued back in place and success.  Then end pieces were a bit more difficult but after the first bridge was completed the second one took about 1/4 the time.  Still have to repaint and weather the bridges but for now this double stack is my maximum clearance car.

mceclip2mceclip3



Of course, the follow thru on any project is very important,..  hence,

mceclip4

Attachments

Images (5)
  • mceclip0
  • mceclip1
  • mceclip2
  • mceclip3
  • mceclip4

Mike, I like the Buffalo Trace option, but curious as to why you cut the crossmembers rather than raising the entire bridge above the base?  In my case I sold off my MTH premier double stacks in favor of Lionel and K-Line.  These latter two are optically close in size to each other, the MTH was a beast "towering" over the other two brands. Regardless I still had to do bridge surgery on my Lionel truss bridges, the MTH Truss was fine - imagine that! 

https://ogrforum.com/...3#165010489493444243

Scouting Dad,

    I originally thought about raising the bridge off the base but I just didn't like the look of it since it really disturbed the proportions.  Next step on these particular bridges is to replace the sheet metal deck with an open grid similar to what is on those MTH Truss bridges (I have three), but that is the subject of another modification I'm still working on.   On another note the Fastrack being used at the moment is just temporary and will be replaced with either Atlas or Gargraves at some point, something that looks more like bridge trackage.

-Mike in NC,

My new work bench. Just got it installed. No drawer fronts or cabinets doors yet as I am still finishing those and will install later. My new work bench is 22 feet long so I will be able pile a lot of stuff on it. The only thing on it at the moment is one of my bridges that I have laser cut.

Once I get it piled high with stuff I will post additional pictures so that it will look like a real work bench.

PXL_20221012_210514514PXL_20221012_210517587PXL_20221012_210527402

Thanks;

idea-thinker

That work bench is longer than the two longest walls in my bedroom train room. My "L" workbench is in the back room, approx 3'x5', 2' deep on both sides. Fits in corner between two doors. That workbench is great!

My new work bench. Just got it installed. No drawer fronts or cabinets doors yet as I am still finishing those and will install later. My new work bench is 22 feet long so I will be able pile a lot of stuff on it. The only thing on it at the moment is one of my bridges that I have laser cut.

Once I get it piled high with stuff I will post additional pictures so that it will look like a real work bench.

PXL_20221012_210514514PXL_20221012_210517587PXL_20221012_210527402

Thanks;

idea-thinker

That's gonna make for a long chair pad. You may need to upgrade your chair wheels to ball bearings !

@Richie C. posted:

That's gonna make for a long chair pad. You may need to upgrade your chair wheels to ball bearings !

Richie;

      I was thinking about having multiple chairs that stay in place to avoid rolling them around since the room is carpeted. I suspect once I am able to do work on the work bench I will see what works best.

Thanks;

idea-thinker

Richie;

      I was thinking about having multiple chairs that stay in place to avoid rolling them around since the room is carpeted. I suspect once I am able to do work on the work bench I will see what works best.

Thanks;

idea-thinker

Get you some of those new fang dangled glass office chair mats …..supposed to be indestructible, and lifetime warranty,…….then you can roll around to your hearts delight……I’d be tired getting up and down from the sheer number of work stations you have possibilities for ……..that’s an incredible work bench!!…..curious, …..what’s the type of projects/work we’re doing on that mammoth bench?……I don’t think Lionel’s bench in Concord is that big!!…☺️

Pat

@harmonyards posted:

Get you some of those new fang dangled glass office chair mats …..supposed to be indestructible, and lifetime warranty,…….then you can roll around to your hearts delight……I’d be tired getting up and down from the sheer number of work stations you have possibilities for ……..that’s an incredible work bench!!…..curious, …..what’s the type of projects/work we’re doing on that mammoth bench?……I don’t think Lionel’s bench in Concord is that big!!…☺️

Pat

Harmonyards;

       I am going to setup a bench testing area to repair engines and accessories for one. But I am also going to be testing electronic circuits that I have designed to control my trains. I have a number of different circuits that control track power, control accessories, sensor circuits, control switches and several other circuits that manage these other functions. My plan is to run 50 to 75 trains at one time so this will require automation. My new work bench will be the platform on which I test my circuits. If you notice I have a shelf at the back of the work bench to set test equipment on and or computer monitors. All of my circuits are software driven.



Thanks;

idea-thinker

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
CONTACT US
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×