Skip to main content

Replies sorted oldest to newest

Hi Kent,

Here's a concept that I worked on - the spacing at the top is 6" center rail to center rail which permits adding in the 2 crossover pairs of switches at a later date

The inner loop needed O48 to fit table. One 2 x 4 added to the right side of the opening will make it work to pack it out.

The inner loop permits changing direction.

From here O36 loop can be added or sidings for activity.

I tried to keep the lift-out / lift-up area spaced for whole tracks. I think the new Lionel bridge would fit right in there or a 40" Atlas truss when funds permit.

So, you run scale diesels everywhere and scale steamers on the outside only. Semi-scale runs everywhere.

Attachments

Images (1)
  • Kent32-Concept1

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×