Skip to main content

Just wanted to give a quick update of my experience with the step issue on the SD9's.   Some months ago when the step issue surfaced,   Scott posted that he would work on making extra steps available for those that wanted to install them themselves.   A couple of weeks ago,   I emailed Scott and asked what the status was on obtaining the extra steps for my 3 SD9's(2 B&LE and 1 DMIR).   Bear in mind that Scott was in China at the time,  but he responded quickly that the steps were available if I wanted them.   I emailed that I did want them and Scott sent off an email to the home office in California,  and have them ship the required steps that I had asked for.   Within a couple of days,  the steps were in my mailbox at no charge.   So,  my sincere thanks to Scott and his employees for the first class customer service I received.

Nick

I put 805’s on mine so that I have the option to hook to a claw coupler. The pilot inserts take some fidelling to get them to fit right. Some of the cut lever posts stuck through the back too far so had to grind them down. The rectangular opening had some larger solder joints that interfered with the insert.  The air hoses also need to be shaped carefully to allow the insert to go in. Also had to cut off the side mounts of the Kadee box.

First one took me about 90 minutes since I had to figure all this out. Next 2 should be half the time.

Attachments

Images (2)
  • IMG_2540
  • IMG_2536

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×