Skip to main content

JD2035RR posted:
Namvet4 posted:

Will take my time and digest it all and follow through.

 

I probably omitted the most simple solution - which is run the Lionchief set and your postwar equipment on completely separate track configurations with no crossover between the two. . . .

I am thinking that you could have the interior figure 8/loop for the Lionchief and have a separate outer loop for postwar.  Let the grandkid try his hand at both control systems, throw in an accessory or two or three, and you guys will have a ball.

JD

Thanks JD for the guidance. I am leaning towards beginning with a LionChief starter set for the holidays and working my way up in the new year. That will give the Grandson something to start with right away while I play catch up and learn all about this "new age O gauge". 

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×