HI, I have a HellGate Bridge and would like to run two O Gauge trains through it. The rest of the layout is Lionel Fast Track and so the bridge base is not wide enough to accommodate 2 Fast Tracks side by side. Question: should I be using different width track on the bridge? If so, are there transition tracks I should use to connect to the Fast Track when the trains enter / exit the bridge base?
Many thanks in advance.