Skip to main content

Replies sorted oldest to newest

Originally Posted by prrhorseshoecurve:

Really Nice David. May I ask Why Lionel MPC tinplate track instead of MArx Tinplate track?

I used Lionel track because I had a lot of it already.  I hadn't thought about using Marx track, but you're right, since I love collecting old Marx metal engines and 6" metal cars and I'm using old Marx electric switches, accessories and even the transformers are vintage Marx, then I should be using Marx track.  I would love to collect other Marx buildings, vehicles and people, but the prices always seem higher than I'm willing to pay.  Perhaps I'll think about changing the track to Marx.

Originally Posted by Jerry Williams:

David, I agree with the others. What a beautiful operating layout!

I too would like to see how you made the crane magnet operational.

I sent you a pm but I have a feeling it did not get through to you for some reason.

Jerry

Here is how I added an electromagnet to the overhead crane.  I removed the electromagnet from a Lionel 6019 uncoupling track.  Underneath the crane base I attached a 2 cell AAA battery box.  A miniature toggle switch and LED was added to the roof of the crane cab.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×