Skip to main content

I needed at retaining wall. I designed the wall for a scaled 2x12s spaced at 12 feet apart at a height of 14 feet.

This is a problem that requires a relatively precise spacing of soldier (vertical) posts spaced evenly at 3" (12 feet) to hold the horizontal beams within the flanges of the soldier course.

Using cardboard as my base, I laser scored the width of the soldier flanges at a spacing of 3" plus the width of the soldier's web. Using a screwdriver I pressed and notched the soldier location that was scored, Then glued the soldier into the vertical notch.



retaining wall 3



The horizontal beams were laser cut  from 1/8" GlowForge draft board.

and slid-in between the soldier flanges.

I scored some random wood grain lines in the board as well.

Each end of the 1/8" board was dapped to fit within the soldier flanges.



retaining wall 2retaining wall 1

once I have all the boards in place, I will take the cardboard backed retaining wall and attach it to the retained area on the layout.

Attachments

Images (3)
  • retaining wall 3
  • retaining wall 2
  • retaining wall 1
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×