Most of us have had extra time at home during the virus shutdown allowing more yard work, closet or shop cleaning and house cleaning. Maybe you had time to work on the train layout, making buildings or fixing or modifying cars and engines. How about sharing your work with all of us.
I will start with the Wye I added to my 30 plus year old layout in May 2020. The new Wye has been written up in more detail in earlier posts but here are a few pictures.
Two new Marx 1590 switches were added to existing track to make the Wye and are shown in the right leg of the Wye. The cattle pen had to be moved from spot of the top switch, a new uncoupling section was added and the two switches had to be shortened to fit between existing track.
This picture shows as long train moving from the inside loop of the main board, through the outside loop of the main board into the outside loop of the new board showing how to reverse a train on the outside loops. I am real pleased with the additional train activity the Wye has supplied with reversing on the outside loops and giving more interaction between the loops.
Charlie