Good Morning Everyone,
I will start off with a bridge I constructed for one of my customers. Let’s see what you have been working on.
|
Replies sorted oldest to newest
Great bridge, Alan……….with New Year’s gone by, our modular displays will slow down and they are on autopilot till take-down on Jan 18th.
So, I decided to start to mobilize for the new push……a few building to do and wiring crossovers…….
I picked up a few Korber kits from Steve at York. Here is the 1st, Anakin Show Factory, which will serve as a scenic block on my Mianne Lift Gate.
Have a great and safe week, everyone……..and, safe travels to all during this storm……
Peter
I’d like to share my latest build I finished yesterday. Two Crescent Locomotive Works dock/ramp kits with pallets, pallet jacks and 2 ramp plates. I had to slightly modify the loading ramps to work with my design which gave me the option of truck/trailer or worker access. I also made a set of stairs and the truck ramp plate. It was an enjoyable build.
Gene
@Genemed posted:I’d like to share my latest build I finished yesterday. Two Crescent Locomotive Works dock/ramp kits with pallets, pallet jacks and 2 ramp plates. I had to slightly modify the loading ramps to work with my design which gave me the option of truck/trailer or worker access. I also made a set of stairs and the truck ramp plate. It was an enjoyable build.
Gene
Very nice Gene. Fits the space perfectly.
Bob
Finished the sidewalk and doors and started mocking up the street market outside of the Clinton Market warehouse. Carts laser cut based on design seen in Boston.
@Putnam Division posted:Great bridge, Alan……….with New Year’s gone by, our modular displays will slow down and they are on autopilot till take-down on Jan 18th.
So, I decided to start to mobilize for the new push……a few building to do and wiring crossovers…….
I picked up a few Korber kits from Steve at York. Here is the 1st, Anakin Show Factory, which will serve as a scenic block on my Mianne Lift Gate.
Have a great and safe week, everyone……..and, safe travels to all during this storm……
Peter
HNY Peter, I like the spacing of your rolling stock shelves. It looks they are 8" of space between them. Is that about right? Also Nice shoe factory. Reminds me of the Mason Shoe company, in Chippewa, Wisconsin...
@Quarter Gauger 48 posted:HNY Peter, I like the spacing of your rolling stock shelves. It looks they are 8" of space between them. Is that about right? Also Nice shoe factory. Reminds me of the Mason Shoe company, in Chippewa, Wisconsin...
From lower edge to lower edge……just about 6.5”………
Peter
@Putnam Division posted:
Thanks Pete, 6.5 looks just right...
Due to this tremendous snow I was delayed in participating.
Last week between removing decorations I repaired the connections and replaced parts so the Rotary Beacon will work again.
Access to this requires an OGR Forum Supporting Membership