@Bill Webb posted:So, yesterday the grandsons and Mom Alice came over for dinner and tested what was operable. It got kinda crazy as trains were run on three levels and all tracks were busy. Levels 2 and 3 end at the bridge piers; nobody violated the strict instructions concerning how far to advance. Surprisingly, there were few problems and the level 1/2 connector was incident free.This afternoon Paula painted homasote and N and W J 612 went from the passenger station to the terminus of level 2 without incident. The only way back to level 1 is backwards which we will probably do tomorrow.
Glad to hear that the running session went well Bill. Grandson's on the remotes? I'd have my hand on the main power switch the whole time.
This is a great shot with the "J" passing the shops.
Bob