nice Job.... love the interlocking mats, i want some!
made more static improvements to the Magic Mountain... Hi and low enter/exit. Thinking about timbers to frame the entrance/exits..Then run the track on the outside to view the run. Ledge or wooden bridge? Maybe mining pit operation below? the steady Marx 500 engine pulls itself around the track, gains speed downhill and tips on the turn, Sooo, note to engineer, Jake Brake on the downhill.
Lab has her nose into it all, and barks commands as the train sparks ozone ino the night air, while i am happy that the track has power with no ded spots.
i dont know whats more fun. thinking, buying, getting, trying, retrying, tinkering with old stuff, awaiting for the grandkids to arrive, or my wifes total lack of interest.. Cheers, and thanks Mitch
https://youtu.be/WYmPmn3q32g