Hello all!
I'm not sure if this is the correct thread to do introductions but I could not locate one (hint) and I'm sure on of the admins will put this where is actually belongs.
Long time lurker and first time poster. First and foremost I wanted to say thank you for having a incredible forum with such a vast amount of information!
I have been around model trains from a very early age as it was tradition in my family that each male child was gifted a train set on his fist Christmas. With times being busy as they are today that tradition fell to the wayside until my father passed a couple years ago and I was able to locate his train set along with my grandfathers set and mine. This started me down a journey researching and buying sets for my two boys from the year they were born and my grandson this past Christmas but we had no place to run them all. We are currently clearing out the finished basement of 25yrs of boxes/decorations at my current residence (O 'h joy) and yes the wife is actually fine with it.. LOL
I live in SEPA just north of Doylestown with my wife of many years. I served in the Marines (which every male on my fathers side has done) from 1989 to 1993 then I was a military contractor for the Marines up until 2019 (soft retirement). I am currently an IT Engineer for the federal gov with disciplines in coding, networking and hardware where I produce conceptual architectures and implement them all to better the veterans experience with the VA (Veterans Administration) and VBA (Veterans Benefit Administration).
So with all this vast knowledge you would think a train layout would be a simple task.... LOL. I stand corrected! I have decided to build the layout to run O Gauge sets keeping budget in mind so I'm implementing RailKing, LionMaster and LionChief Plus 2.0. I will be using Gar-Graves Phantom track with Ross Custom switches and controlling the layout with MTH DCS, WIU and a Lionel Legacy system which I have already purchased.
I've attached the floor plan and an image of a layout I found that I think will work in the area I have. I just wanted to share with you all (the experts) to get some feedback, the layout image needs to be tweaked with the top (L) area having a mountain along with another one at the top right corner connected with a two track bridge and the station area actually running along side the 23ft span to the left. I see this with several layers starting with the 8ft section to the right being the lowest and stepping up four levels with the train station area being the third and the mountain area being the forth. I'm not locking myself into any time period but will be incorporating scenery from areas in PA that I have been to.
Thanks again and looking forward to being a contributing member!