rsymons,
Ron makes a good point you will need to transition in and out of both tracks in both directions, not only an expensive set up, you will also need the extra space on your platform to accomplish it. I actually worked around this exact situation on my 1st level, redesigning my layout. I do wish FasTrack would come out with a 60 degree crossover myself.
PCRR/Dave
On the 1st level notice the back to back 711 lionel switches, right before the cross over, as part of the redesign engineering. I really needed that 60 cross over.