I am a bit of a rookie jumping back into my Lionel trains after a long absence ( retirement and freeing up the office was the catalyst ). I am setting up my first permanent layout and find that I would like to put the unloading / uncoupling buttons about 3 feet away from the actual track. I need to go under a couple of loops of track. Upon opening and inspecting the control box and the track , I discovered that I would need much better solder skills than what I currently have or some suggestion on how to move the ribbon ( 4 wires ) to the edge of the layout for operation. At this point, I believe that I have enough wire that came with the track, but do not know how to run it down thru the plywood and then back up to the control box near my designated control station.
Only idea I currently have is to cut the wire and spice under the table with a terminal block ( using 4 strand telephone wire if I need extra length ).
Any suggestions on an alternate approach ? Many thanks in advance.