Originally Posted by willygee:
In the 3rd photo how many engines?
Hmmm, looks like 12? Some are in the shed. I was showing off the MTH Dash 8s for another forum.
Originally Posted by Gary Graves:
"some wiring issues causes power loss"
Joe, how often do you provide a power tap (how many feet between)? That's a pretty large layout and it seems like you must have quite a few to run trains without power loss.
I divided the loops into quarters. So the runs are about 75'. They were good but the signal and power is dropping. I thing the joints degrade with weather and dirt entering. So I may remove everything, clean, and then make the blocks 50' roughly? I'll see how they do after some cleaning. I have to remove all the screws from the rails that bond them to the ties. It won't allow them to float in the hot summer sun. When the sun goes down, the rails shrink big time! I installed the special short pieces of track now that allow for this. Hopefully my joints will stop from falling apart and letting dirt in.
This outdoor stuff has a steep learning curve for me. I just happen to go with multiple TIUs for the first time, and the software has bugs. Makes me want to fly radio planes and boats instead.
Anybody in the future, will probably go with battery to save all this hastle. When I started batteries were expensive, heavy, and would only last a year.