Skip to main content

Howdy 0 Scalers,

I had a bunch of photos left over from last year that were not used. I fugure I might as well post them so people can see more of the layout. The photos generally follow the layout in sequence as the trains run from area to area. There are still large sections of the layout that still need to be scenicked. I haven't put in a facia yet so I've cropped out the areas that showed  below the layout and also the ceiling. Normally I don't like to post too many photos but it seemed right to just blow all of these out and get them out of the way and start fresh later with new projects that are in progress now.

Thanks for looking.

If anyone responds to this post, please don't repeat all of the photos in your response.

01 Y6b 2196 IMG_8438 A OK LR02 M 475 IMG_7987 A OK LR03 J 612 IMG_7052 A OK LR04 Class A IMG_8981 AA OK LR04 Y6a 2165 IMG_9069 AA OK LR05 M 475 IMG_8044 A OK LR06 M 475 IMG_8055 A OK LR07 Y6a 2165 IMG_9127 AAA OK LR09 J 612 IMG_7112 A OK LR10 Y6b 2196 IMG_8772 A OK LR11 Y6b 2196 IMG_8810 AA OK LR13 Z1b 1363 IMG_6953 A OK LR14 Y6a 2156 IMG_7739 AA OK LR15 M 475 IMG_8162 A OK LR16 Z1b 1363 IMG_6984 A OK LR17 Y6b 2196 IMG_8882 A OK LR

Attachments

Images (16)
  • 01 Y6b 2196 IMG_8438 A OK LR
  • 02 M 475 IMG_7987 A OK LR
  • 03 J 612 IMG_7052 A OK LR
  • 04 Class A IMG_8981 AA OK LR
  • 04 Y6a 2165 IMG_9069 AA OK LR
  • 05 M 475 IMG_8044 A OK LR
  • 06 M 475 IMG_8055 A OK LR
  • 07 Y6a 2165 IMG_9127 AAA OK LR
  • 09 J 612 IMG_7112 A OK LR
  • 10 Y6b 2196 IMG_8772 A OK LR
  • 11 Y6b 2196 IMG_8810 AA OK LR
  • 13 Z1b 1363 IMG_6953 A OK LR
  • 14 Y6a 2156 IMG_7739 AA OK LR
  • 15 M 475 IMG_8162 A OK LR
  • 16 Z1b 1363 IMG_6984 A OK LR
  • 17 Y6b 2196 IMG_8882 A OK LR
Last edited by christopher N&W
Original Post

Replies sorted oldest to newest

Always a treat to see more photos of your outstanding railroad Chris. So many subtleties such as the low telephone poles  mounted slightly leaning on the downward slope, the rocky shore of the creek, guard rails on the girder bridge, and that "just right" creek water...nothings been forgotten, so special.

Thanks Chris

Bob 

Guys, Thanks for all of the comments.

Jim, I'll get a track plan posted in time but I have to run out for a while now.

Alan, I really appreciate what you are saying, but I have to say the layout is fool's gold right now. It'll need more time before it is ready to really show. I'm working pretty hard to get there, but there are too many incomplete patches right now.

Stephen, you know the JH came on the scene a year later than my railroad represents.

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×