Skip to main content

On this day (April 21) in 1943 all service on the Central's Getty Square Branch on the Putnam Division ceased. 

The Getty Square Branch was electrified and ran from Van Cortlandt Junction (JS Tower) to downtown Getty Square in Yonkers, NY and was approximately 3 miles long. It connected with the Hudson Division, terminating at Sedgwick Ave. in the Bronx. 

A lengthy court battle froze the line before the railroad got permission to scrap it in 1944. 

Sedgwick Ave to Getty Square Timetable

(Both photos) Lowerre Station, Getty Square Branch

lowerre station

lowerre station 2

Tom 

Attachments

Images (3)
  • lowerre station
  • lowerre station 2
  • Sedgwick Ave to Getty Square Timetable
Last edited by PRR8976
Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×