Skip to main content

Neal, nice!  Looking good.  The layout will be great.  Is that an AIU in the first pic?  I've never felt the need for one on either layout.  Love to hear how you like it.

You've seen my double-tracked, 8 X 10's, with the 1 1/2 inch clearance to the edge.  In five years, the only way anything fell was when I was talking instead of looking and one train caught up to the other on the same track.  Being O gauge, there are numerous derailments, especially in the first year.  Since then, all those little track issues have been resolved.  BTW, after falling six feet to a very hard tile floor, the only things that have ever broken were those cheap plastic trucks on the old Lionel stuff from the 80's.  Haven't had one in years, but, I was amazed the cars themselves always survive completely intact.

Your trains look great up there.  The CP holiday train is always cool to see.  Have you considered a backdrop to hide the brackets?

Keep them coming, it's fun to see the progress. 

Jerry

Got the main safety wire up today - just got about 60' (will have PLENTY left over) of 1/16" galvanized wire off the spool at Home Depot.  Able to get adequate tension by hand & coarse enough to secure easily w/screws & washers. 

20191223_16464920191223_164659

Don't want to forget the back side....

20191223_164709

Now time to finish what will be the main line, & start adding some buildings, too!

Merry Christmas, Happy Hanukkah, & a Happy New Year to all!

- Neal

Attachments

Images (3)
  • 20191223_164709
  • 20191223_164659
  • 20191223_164649

Got the TIU & AIU wall mounted.  Got the LEGACY CAB-2 hooked in, too, though now the WIU seems to be having issues.  Will try to program in some 3rd Rail TMCC engines. 

20200111_142403

Once all the command stuff is situated I'll finish fitting the front track and clean up some of the XS wiring.  Then I'll get some 1" & 2" foam board to shape for several of the corners & wire the buildings.  Still thinking about doing 3 sets of corner boards: spring/summer, fall, & winter. 

- Neal

So...there has been an unanticipated side effect to the layout.  Much to my enjoyment (and wife's dismay), people have started to bring in or talk about bringing in, old train-related stuff they no longer use or need.  My first gift arrived earlier this week - a photo print of a B&O 2-8-0 Consolidation. 

20200116_113902

The client said it was taken in the 1920s, but not much else known, & nothing written on the back.  A quick search on rrpicturearchives.net seems to suggest it would be an E16 class, though there are only 2 photos of such an engine in the collection that I found, and they're both from the other side.  Still, a lot of the subtle details seem to match, & the time period of those photos is consistent w/this one. 

- Neal

Attachments

Images (1)
  • 20200116_113902

Have to bump this thread.  Can't believe that I never saw this one before with me building a ceiling layout.  It came across as a search result.

Great job Neal and I enjoyed reading all of the posts (many from folks who are helping me on my own ceiling expedition) from Step 1 to the the completion.   .  I liked the use of the eye lag screws and wire instead of Lexan/PlexiGlas for flying train protection.  Great idea!.

Last edited by Amfleet25124
Amfleet25124 posted:

Have to bump this thread.  Can't believe that I never saw this one before with me building a ceiling layout.  It came across as a search result.

Great job Neal and I enjoyed reading all of the posts (many from folks who are helping me on my own ceiling expedition) from Step 1 to the the completion.   .  I liked the use of the eye lag screws and wire instead of Lexan/PlexiGlas for flying train protection.  Great idea!.

You can get plastic coated cable too for more scratch resistance. (hvac and plumbing supply house item.... only maybe at a bigbox)

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×