Plywood or foam board.
Being strongly influenced by the recent offering of Christmas layouts in OGR I’m contemplating a second level to hold Department 56 type buildings. A trolley would be the only operating feature on this level. Multiple tracks would be underneath with a minimal number of switches within reach. My concern is being able to lift the top level off. I’m thinking to have it in two sections with a set up to unplug the lights for ease of removal.
Any insights and suggestions are greatly appreciated.
Jay