Skip to main content

Originally Posted by Amfleet25124:

What did I do today?

 

Finally decided on a format for my permanent layout*  It’s going to be a 36x80 HCD and eventually 2 HCD’s in a L-Shaped Format, but I need to get the trains running! 

 

Placed the HCD on top of the two 18x36 Mod-U-Rail modules that I had. Biggest deterrent to me doing a permanent layout was my obsession with having passenger trains continuous running (on O36 or wider) in addition to switching on the same layout but trying to squeeze it in a 36-inch wide layout.  

 

20150809_170024

20150809_172458

20150809_173213

20150809_173705

 

I then created a 3x6 layout from the MTH 3x6 Action and ThorTrains MTH Door layouts with a few accessories as my beginning track.  With the second HCD on the “L”, will probably use this one to fit in the Inglenook Sidings that I like very much.

 

HCD Switching Plan [8.9.15)

 

 

HCD Switching 3D [8.9.15)

 

Took a few photos of a potential setup.  Yes, the track types are all different, but I did that on purpose so that I could see the spatial differences myself instead of an electronic image.  Also the layout in the photos is missing the 5.5-inch tracks on the straights. Will be using ceiling tiles on top of the HCD for sound insulation.

 

My plan is to have the control panel on the long side.  When I used the 3x6 carpet on the door for effect, it left an empty space on the end that by default just screaming to be the control area.  Don’t know yet, because that extra length can make all the difference on a small layout.  Plus, I’m not sure about operating a layout from that vantage point.

 

20150809_174239

20150809_182555

20150809_183923

20150809_183930

20150809_183936

 

 

*-My weekender 6x11 carpet on the tiles layout will still remain and get laid out each weekend.  This is where I will get my fix for continuous running for my passenger trains.  With my joining a club in June, I can get my fix of watching the passenger trains run through scenery. 

 

 

Kevin,

Seems like you have all your bases covered.  The hollow core door layout looks good.  I agree, I would wan to control from the long side, although I visited a friend over the weekend, and he has his controls on the short end of a much larger layout.  He uses DCS, so we could walk around the whole layout however.

Originally Posted by Mike welkie:
Hey forty rod. For the Woolworth awning, I found some red striped scrapbook paper at Michaels. I am going to do a Woolworths store as well and found some suitable paper there. Now I need to get some of those nifty
laser cut signs !
Mike

Mike, I  went on line a searched for striped red paper and found what I needed.  Also found some green and white for a grocery store and tow tone lavender for a ladies' ready to wear.  There were others, too.

 

I'm both lazy and cheap, so it worked for me.

 

Tom

Originally Posted by Mark Boyce:

Elliot,

A fine photo of Matt hard at work!  Although the looks a little too happy to me.  Is he losing his mind with the number of these he has to do or has he been sniffing that glue he is holding in his hand?

 

On a serious note, you fellows in the Twin Cities area are really doing a great job!!  I am surely impressed.  Too bad, I am taking an early "retirement" from work!  I won't ever have the chance to get a trip on the company to the Land of a Zillion Lakes, where my manger is located.  I'll have to make a trip on my own dime!  ;-)

Well Mark, I don't think it was he glue. Have you ever tried sniffing CA (super glue)? Let's just say it's no fun.

 

Bummer about losing your potential free ride out here, but on the upside, now you can visit whenever you want.

Find attached a sketch I made of my current layout.  Only part not able to run on is the purple line, still working yards and engine service/TT areas.  All else is runnable and has 4 different elevations, yellow 360 loop being the highest.  Still tweeking super elevations and grades, running Big Boy pulling K Line 18 inch CZ ten car consist to check clearances/grades, etc.  Oooopsss... they are 21" car consist, only the baggage is 18" in length.

MOKATX layout 001

Attachments

Images (1)
  • MOKATX layout 001
Last edited by texastrain

I realize my layout is what seems to be loop-de-loop.  But, with scenery and landscaping (when added), and backdrops in place, hope to break it up and provide visual as needed.  This is on 24 X 28 layout, walk around with center entry/duck under beneath the high bridge and "Y" on the blue line.  Also, will be adding an upper level with classification yard, industrial areas and two more lines.  Have a lot to do, long way to go.  But, being on here gives one a lot of ideas and inspiration.

Today I posted a new 3.5-minute video (#32) in my LCJ&I Lines series, on YouTube. It describes the building of the O-scale craftsman kit, "Contention City Depot" by Andersen Model Kits. It provides a small wooden, old-west railroad depot, modeling the depot at Contention City AZ (now a ghost town). The depot was moved to Old Tucson, a western theme park. The model depot fits onto one side of a red rock canyon I'm building on the layout.

http://youtu.be/rFf-E6u7NsI

I've spent the last couple days working to install the "A" yard ladder. I was just about to put in the last switch, when my soldering station decided to give up the ghost. I was just two wires short too. I haven't used a soldering gun since I bought that thing, but I'm going to have to bust it out to finish.

 

Normally I use crimp on tab connectors to attach my feeders to the rail, but I've found that they don't have as much grip going into the flat bottom rail of switches, so I've been soldering them.

 

The 2 gray wires are something new. Because I have cut these switches down, and have the minimum spacing between, it will probably be necessary to route power on the closure rails. It was Chugman that clued me into this potential pitfall.

 

IMG_5922

This little SPDT switch is the rest of the solution. The two gray wires connect to the end terminals, and track power goes to the one on the side. The switch will be mounted in such a way that the that the crank mechanism on the manual switch throws will depress and release the lever.

 

IMG_5923

I took this picture to show just how close I cut the switches. There's about 1/8" of rail beyond the end of the points.

 

IMG_5924

There are eight chopped 072 switches in the ladder, but only 7 are visible here. There are a couple of connecting tracks that need finishing, and then just the straight yard body tracks, and the "A" yard is done!

 

IMG_5926

 

Last up Roseville. Patrick should be here Friday so we can finish the benchwork. Joe will be here Thursday to do more wiring. I'm looking to get a couple sections buttoned up on that front.

Attachments

Images (4)
  • IMG_5922
  • IMG_5923
  • IMG_5924
  • IMG_5926
Last edited by Big_Boy_4005

Had a scheduled train show on Saturday and an unscheduled one on Sunday...

 

The scheduled one was in Gravette, AR for "Gravette Day". 

 

GEDC1632

My Polar Gi-raffe Express Berkshire is still in the shops pending parts from Lionel (will post a separate "Under The Hood" article later this week when the parts arrive), so my 2025 that I overhauled last year did the honors: 

 

GEDC1634

Had one chap walk into the layout room at the Museum and quip, "This place smells like LIONEL!"  He also dug the Bugs Bunny reference "It's a gi-raffe, a gi-raffe!"...   

 

Added the Sunoco tanker seen above to my fleet, as well as some Model T's for the scenery end of things. 

 

A future project will be repairing this Marx Santa Fe diesel (belonging to the Museum) in need of a new collector assembly...

 

GEDC1635

While riding home from Gravette, I got a call from one of my fellow directors of the J. Reilly McCarren Museum at the Arkansas and Missouri Railroad (https://www.facebook.com/amrrfriends). 

 

Seems that some Tyson bigwigs had donated a cool quarter-million to childrens' charities and scholarships, and the A&M had laid on a special passenger train in their honor.  Could I show up with a gi-raffe or two?  Well, as my new business cards say:

 

havegiraffev2a

So, I was at the JRM Museum bright and early on Sunday: 

 

GEDC1639

Sharp-eyed viewers will note the NYC F-Unit lashup that I repaired some weeks back.  The locos pulled fine and the horn was beeping merrily!

 

GEDC1640

Even slightly abbreviated, the gi-raffes were a hit!   

 

As a side note, both the Gravette and JRM museums want to consult with me about putting permanent Lionel displays at their locations! 

 

I finished the weekend with repairs to my homebuilt Plasticville whistling station's platform, with the able assistance of Norma B. Kitteh, CFE (Certified Feline Engineer)...

 

GEDC1643

Mitch

Attachments

Images (7)
  • GEDC1632
  • GEDC1634
  • GEDC1635
  • GEDC1639
  • GEDC1640
  • GEDC1643
  • havegiraffev2a
Last edited by M. Mitchell Marmel

Well I wanted to put down the final coat of Rust-Oleum Epoxy shield Paint today. Then I went out to the Breezeway and discovered that I don't have the right color that I put down first. I put down Battleship Gray first. Then when I went out there today I discovered that I had Armor Gray which dose not go well with Battleship Gray. So I guess I will be painting again this Saturday. Tomorrow and Friday I have DR. appointments .    What do you guys think on the Colors ?

DSC_0159

DSC_0160

Attachments

Images (2)
  • DSC_0159
  • DSC_0160

Hi Everybody--    Hooray !!!   Earlier this evening I applied power from all three of my transformers (ZW, KW, LW) and the three main pilot lamps lit up.  Then I increased one of the small size throttles on the left side of the ZW to give me a voltmeter reading of FIFTEEN (15) volts.  This powers up the switches using fixed-voltage plugs as well as the four lights on the Hell Gate Bridge as well as the 153/163 block signal switch indicators.  Operating the FIVE DPST toggle switches on the control panel turned on the lights in the Greyhound Bus Depot, the Sunoco gas storage tank Yard Light,

the Oil Derrick, the Rail-King interlocking tower, and the 464 Saw Mill.

Suzie loaded the planks and logs into the Sawmill and it worked perfectly.  I bought it NEW from the Great Train Expo in Puyallup, WA for $ 50.00 one year ago but never tried it until now.

SIX (6) DPST toggle switches on upper row of control power apply 18v power to the Display Tracks near the bus depot.  One for the SP AC-12, one for the CSX SD-70ACe, one for the Millenium Business Car, and the other three for lighting ELEVEN (11) Santa Fe passenger cars....

Three DPST toggle switches are vacant and available for other things.  The other small-siozed throttle on the ZW operates the main line that surrounds the Trolley Yard.

One of the throttle outputs of the KW operates the "passing siding" external to the Hellgate Bridge.  It hosts a 132 Station and Auxilliary freight station with operating fork lifts.

The variable output of the LW will provide power for the various storage tracks within the Trolley Yard.  The green lights visible on control panel are the controllers which are cabled to the 022/072 track switches.  The fixed 14 volt output from the LW supply one set of those DPST toggle switches while the fixed 18 volt output supplies the other set of toggle switches.   Lots of wiring indeed !!  I have been using cable ties to try and make some of this mess a little bit neater !  Again, I've been doing this whole project without a wiring diagram !  However, so far, so good!!

Except earlier this evening, the lights on all ELEVEN (11) Santa Fe passenger cars all went off at once.  Panic city !!!!!

Luckily, I found a loose splice joint for one of the COMMON leads heading to a post on my power distribution panel.  Tomorrow morning, I'll take it apart (4-wires under a wire nut) aqnd solder them together instead.  That should do the trick !!

Until then, guys, enjoy the newest photos !!

 

Cheers.

 

KRK

100_0711

100_0712

100_0713

100_0714

100_0715

100_0716

100_0717

Attachments

Images (7)
  • 100_0711
  • 100_0712
  • 100_0713
  • 100_0714
  • 100_0715
  • 100_0716
  • 100_0717

Tuesday I picked up a derelict Lionel KW transformer at my favorite antique store for a very reasonable sum, brought it home, opened it up to replace the power cord, cleaned everything and it is like new !! I use a Z and a KW to run my 5 loops of track and some lights etc. This new KW is so smooth and nice so now I have two extra. Will keep one as a spare. Nice to get a bargain.

Our Gold Edition 1225 came back from service yesterday and we got it powered up and took it for a test drive. All is well again.

 

While it was off the layout, we switched the Black version 1225 to the Gold set and then used a baby Hudson (D56 livery) to pull the blue and maroon scale set. We had guests over the past few days so we had to improvise. I was amazed that the baby Hudson could pull eight Heavyweights, but it did.

Brian:  your baseball field looks really nice.  have you ever contacted Carl Chambers for some more itmes?  he's located in the greater Cleveland area and for a long while made bleacher seats, batting pens, concession stands and other itmes for a proper baseball park.  They were made from laser cut wood and really look accurate.  if you contact me, I can give you his numbers and whatever.

 

Paul Fischer

Fixed the cracked fascia board on the module from my earlier post by cutting down a center support for a softer curve. Forgot to take a photo before putting it away. Put fascia boards on Module #3. Hopefully I can get the fascias on the rest of the modules by Sunday so I can start on the scenery base. Since this is a branch section, the track will be mounted directly to the baseboard, ballasted and surrounded with dirt from the remnants of the Redlands Loop right-of-way.

 

 

2015-08-11 20.16.17

2015-08-11 20.16.30

Attachments

Images (2)
  • 2015-08-11 20.16.17
  • 2015-08-11 20.16.30
Originally Posted by fisch330:

Brian:  your baseball field looks really nice.  have you ever contacted Carl Chambers for some more itmes?  he's located in the greater Cleveland area and for a long while made bleacher seats, batting pens, concession stands and other itmes for a proper baseball park.  They were made from laser cut wood and really look accurate.  if you contact me, I can give you his numbers and whatever.

 

Paul Fischer

Thanks Paul if you email me his info I would be interested to see what he offers.

Room completion is beginning to take place down on this end.  Anything below ceiling level won't need as much detailed finishing since it'll eventually be hidden by layout.  Soon I'll need to make a decision on a flooring.

 

One major milestone was the installation of additional lighting with 12V LED strips, like those used to replace incandescents in passenger cars.   These will normally be dimmed to maximum to simulate night.  I cranked them up to show for the photograph.

 

Bruce

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×