Re - created the area around team track 2 making it more dairy loading/ unloading oriented while still allowing for other kinds of freight cars to be off/on loaded too. Installed a Lionel milk stand ( re -located from the team track near brewery complex ) from my original Lionel set of 1956.
Re - created the team track unloading area near the brewery. Installed a new piece of remote control track for loading/unloading the barrel car, Moe and Joe lumber car, and dump car. Removed the milk stand and relocated it to team track 2. Found a piece of hard black foam rubber which gives the appearance of smooth asphalt. I cut into shape and put it down beside the remote control track. With some rocks, I created a border to one side of this pad so the barrels would not roll away when discharged from the car. ( I really don't care for the look of the Lionel dump trays.) Next I re - created the scenery surrounding the loading pad and actually put about 25 small barrels on the pad itself ... this lends credence to and allows this area to become a functional facility of the brewery complex while at the same time retaining the flexibility for other kinds of freight on/off loading.
Next thing to do ( hopefully tonight ) is pop out the lake so I will have access to my far siding ( very long spur that services an industrial area ) on the back part of the layout. That track needs an extreme cleaning! After the cleaning I will test with one of my TMCC locomotives. Having this track operational allows me to run a switch job throughout the industrial area while simultaneously running trains on the main lines. This industrial line will allow me to have a trolly line and 4 trains running simultaneously. Fun times in Patsburg!! I'll try to get some photos of the new team track changes up soon.