Hi guys, Its been a while, but I have been working on the layout. I think last time I was here I told you all about switching out my street lights to LED's. Well I have been doing more of that with all the other stuff I have so I can try and run everything from a 12v power supply threw a DC to Dc buck converter. Well to date I have8 Menards Buildings, fuel station that I switched to LED, a set of yard lights, and 3 Menards lighted vehicles powered up with no problems. Here are couple Photos of that.
Then I told Mark that I would let him know what I had from Menards, so here is a list for you Mark!
15 Buildings, 5 lighted cars and trucks, 2 race cars, a dump truck, ready cement truck, 3 ambulances, 1 fire truck, 1 electrical boom truck, 9 tank cars, 5 box cars, and 12 Military flat cars with loads! I hope that give you an idea! LOL
Oh wait, these came today!
That brings it to 17 Buildings! LOL
I hope your all safe and doing well! I also hope you all are able to fine time for your layout and trains~! But most of all I hope you all are having fun!