Still cleaning, trimming, and neatly refastening, the last of the spaghetti wiring.
I clipped out about 20 ft of loose excess all together and most wires can easily be followed visually from one knee, without going under.
Played with adding a couple of lights to darker areas.
The culvert loader has a lit office interior now, and a homemade yard floodlight fashioned from a plastic top hat is being mounted on, or at least near, the water tower tonight.
Drilled 12 closely oriented holes in a 2x4 on the layout frame and mounted a dead subwoofers thumb screw terminals, for a neat and clean transformer input to the 4 tracks.
I have a few spring loaded speaker terminals that will take on the lower amp constant low, med, high voltages for lights, turnout, and accessory inputs.
Since I lowered the layout, my shelves wont fit under anymore. Not without losing 1 of 5 shelves, and they will hinder moving the layout easily again.
After adding wheels to the layout, I don't think I like my shelves so much anymore, but they were also my transformers mount. So I dug out a unused scrap of chrome piano hinge about 3 ft long, and I'm going to experiment with a shelf that will flip up, hang down behind the "curtain", or flip up & under to store.
If it works out well enough, each of the four 1033s will get its own fold away shelf.