Here are a few pictures on my completed second loop. Hopefully by the end of the weekend both loops will be wired and running.
|
Replies sorted oldest to newest
Looking good! Gonna be a lot of wire. Keep at it and you'll be running trains in no time.
Thanks ATSF, the first loop is wired, the second is almost complete. Can't wait to see 2 trains running in opposite directions. I AM SUCH A KID.....
Jim it looks like you have the hard part well under control. Now the fun part. I bet you will be running by a week from Sat if you keep going at it.
Thanks Pops, hoping to run two trains at midnight the 31st.
Wow,
that nice!
Keep us updated!
Andre.
Jim,
Nice progress, thanks for sharing.
looking real good!!
Looks awesome Jim, wish I had that much space. Love the wide curves!
Jim,
Real good start on the track design, can't wait to see the final out come.
PCRR/Dave
Thanks those 2 are 138 and I will have at least 4 loops with that radius. I will be able to go from the outside to the inside on all of the loops. I have the yards planned but the next step will be to do the scenery against the walls so I do not have to crawl over the other loops.
Access to this requires an OGR Forum Supporting Membership