Skip to main content

I've been doing a steady job of upgrading some TMCC locomotives to ERR Cruise M for an acquaintance during the Christmas holidays. One of them being a K-Line GP38-2. 

When I got to this one, I couldn't help but notice the very VERY awkward wiring job done for the lighting. This is for those out there who are a little curious what went on in one of these things.

IMG_0801

IMG_0802

If the pictures don't show it well, the wiring for the lights is tucked into walkway pieces, which made it very difficult and annoying to remove. I'm not sure who thought this was a good idea when K-Line was still is business, but if it was me I would've said NO FLIPPING WAY.

Attachments

Images (2)
  • IMG_0801
  • IMG_0802
Last edited by Mikado 4501
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×