I've got to get busy again. I have let too many things interrupt my goal of getting something done on the layout every day. I wanted to at least get a little done every day rather than having marathon sessions as much as I could. I have found it is far to easy for me to "take the day off" and accept excuses.
Art
Art, I know the feeling. Last Wednesday, I had a doctor appointment at 11 AM. By the time I got home and had lunch, it was 2 PM. In my mind, the day was shot! Thursday I made myself get back down there, and it was a little difficult to restart, but once I started looking at my project list, I picked an easy one and got the ball rolling again. MOMENTUM!
Your layout ain't going to build itself.
Mike, sadly Matt and I are done. Irreconcilable differences. I'll be doing these 4 switches all by myself. I can do them, it just takes me a little longer, and it also takes time away from other things I could be doing.
Doug, the basement is actually more than twice the size of the train room, but the walls are sacred. There will be no expansion beyond the "line of death". I was perfectly happy with the layout, and then I started reading the NMRA achievement program specs, and got to thinking about operations, and suddenly decided one yard needed a third track and two yards needed "engine pockets". I swear, after this, I'm done with track (except for the roundhouse on top of the big helix). Beside, my stash of switches is almost depleted.