Thanks Bruce. I'm not sure that any amount of planning would have caught that one. There was never a well drawn out plan of the upper deck anyway. I'm a firm believer in "seat of the pants engineering". There may need to be an even further fudge when I get around to hanging the Masonite. What I'll do is add a support block to the bottom of that raised roadbed, which will pull the backdrop a bit out of plumb, but give a little more room for the lowest track.
More progress today. I started by entering all of my paperwork from yesterday into the computer. I named all the signals on the lower level. Tomorrow, I'll do the same for the upper level.
Back to work on the south wall lower deck, Hastings and Prescott. I filled in the narrow strip next to the backdrop, and more of the river bottom. My goal here is to get everything filled in so I can paint the rails.
This is an interesting angle. The two tracks near the backdrop are Prescott, Wisconsin (ex CB&Q). The area with the fresh plywood is the not so mighty Mississippi River. The next track is the CP (ex Milwaukee Road) main at Hastings, Minnesota, and the tracks in the front are the ConAgra Mill.
I got tired of kicking that piece of fascia which has been on the floor for more than a year, so I just tacked it in place. In the process, I learned that I needed to let it out on the inside curve, because the 89' cars were hanging over and rubbing.
I broke out the pink foam to create the river banks. By the way, this is going to be a winter scene in the whole aisle.
Last week, I mounted my signals to the signal bridges. These still need to have their wires run over the bridge and down the legs.
This one has had its wires run, and just needs to have plugs soldered on and the brass tubes painted silver.
Here's a Plasticville bridge. Its name is Oakland, after a real station on the joint BNSF - CP. each of the four signal heads has a name, O1E, O2E, O1W and O2W.