Over the last 15 days I finished installing all of the track and roadbed for my new 7 X 21 foot layout. This last bit of installation work involved the refinery and missile railcar base areas of the layout. The point to point track for a tourist trolley ride is in place at the far end just needs to be screwed down tomorrow after I finish installing screws in the missile railcar yard's trackage.
Here's the siding and stub track for the refinery area. I checked my train inventory the other day and found I have 18 Sunoco tank cars, so there's some unit train operating possibilities for the refinery trackage. I have a "cat cracker", three Colber oil wells, three storage tanks and a Sunoco "neon" sign to go in the refinery area.

Here's the missile railcar base yard area.

Here's a sort of "aerial" view with all the track and roadbed installed on the layout. The area at the near end of the layout will be the "tourist trap" area of the beachside town in which the layout is set.

The next task, which will take some time, will be running the track wiring from the various power clips to the MTH terminal block for the related inner or outer loop. When I'm done with that task, I have a couple of people coming to help who offered to build some slide-in-slide-out shelves under the layout to hold the transformers and other items which will make maintenance easier.