That track work is perfection! Looking great @gunrunnerjohn
Thanks, but up close it may not be quite so "perfect". Why do you think I take shots back from the layout. I actually took my Dremel with a Cratex wheel and polished the joints, that actually does some real good. Even though you dress them up with a file before assembling, they still have rough edges. I'm trying to clean them all up to minimize the clicks going over the joints. I also had a few gaps that were wider than I liked, so I cheated and filled those with solder and smoothed them all down with the Cratex wheel. I'm sure the track laying purist's are turning in their graves! I have an excuse, this was my first big project with Gargraves Flex track, and I had to climb the learning curve. If I ever did another one, I know there's a lot of stuff I now know and would do a bit different. I learned a lot about Gargraves Flex in this experiment, that's for sure, maybe it'll come in handy.
It must be nice to be running trains with active switches. I started laying GG track a few weekends ago and it's been a slow, learning process cutting and bending and mating track with switches. My curves are tighter at 0-42 and that's a challenge. I've got it figured out I think, but I am using your layout progress as the carrot to where I am heading. I am enjoying your progress reports.
Getting all the switches operating was top of the list once the track was laid. I'm setting up routes in my Legacy system to do various tasks and set all the switches. #1 route was return all the switches to nominal for mainline running! I can pull out on the main, and then just fire that route and all the switches are aligned correctly and I'm good to go! Having the turntable all command controlled is the cherry, it's so cool to just stand there with the remote and operate the whole thing from there.
With O42 curves, I hope you're not using flex track, that would be some tight bends! I'm not sure I'd want to try that, I kinked a couple pieces with wide curves.