Skip to main content

I have printed all of the parts ffor the Fire Hall but have run into a problem.

Are there any assembly instructions or plan drawing of the firehouse?

Where do the stairs (Part 2) go. Inside or outside of the building, Just where?

Parts K & L seem to be identical but where do they go ? Aare they roof parts of floors.

All of the parts have printed up beautifully and putting up walls is not hard to figure out, but: these other parts are a bit mysterious to me.



Did DYLTRAINS give any instructions? If so, how can I  get them.



Thank you,

You guys always come through.

Quay



Attachments

Images (1)
  • mceclip0
Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×