Would it be reasonable to provide power from a Powermaster 180 connected to a terminal block using 14AWG wire and then running a 14AWG feeder to 4 16AWG legs connected via suitcase connectors to the 4 command switches in this temporary Christmas 072 layout? Or should I consider different drops?
If this is an OK idea, do I simply connect each leg to the AUX GND and AUX IN with the jumper staying in place to power the entire track with the drops?
Original Post
Replies sorted oldest to newest